This stage begins with a detailed on-site survey and an in-depth analysis of the space, followed by the development of a functional floor plan. The proposal includes the layout of new rooms and partition walls, complete with precise dimensions. Each zone will be assigned a specific function, and the placement of essential furniture and household appliances will be presented in two alternative arrangements. For multi-level interiors, two layout options will be provided for each floor.
Simultaneously, a Moodboard will be created—an inspirational board featuring reference images, target color palettes, materials, furniture, and key interior elements. An individual Moodboard will be developed for every room included in the project.
In addition, a cost estimate will be prepared for all finishing materials and ready-to-purchase items (e.g., freestanding furniture, lighting, tiles, paint colors, wallpapers, etc.). This estimate excludes custom-made elements and contractor fees—those are covered in the comprehensive design package.
This package includes the creation of a 3D model with photorealistic visualizations, featuring two perspectives for each room, along with optional additional views. As part of the process, visits to showrooms will be arranged to select key materials such as tiles and flooring.
In addition to all the components included in the conceptual design, the comprehensive design also features a detailed specification with a cost estimate for materials and furnishings. A full set of technical drawings will be provided for the construction team, including electrical, plumbing, demolition, and new wall plans.
Further drawings will detail wall finishes, flooring and tile layouts, and the placement of fixed decorative elements. A complete carpentry documentation will also be included for all custom-built furniture.
The extended cost estimate will account for all subcontractor fees, including builders, carpenters, glaziers, upholsterers, and other specialized services.
Supervision of construction work is carried out through regular site visits scheduled in advance in agreement with the client. After each visit, a report will be sent via email, including photos of the current progress and a detailed summary of the construction stage along with next steps.
Additionally, a delivery schedule will be prepared for the client, outlining priority items—from those requiring urgent ordering to those that can be procured later in the process.